HI version is available. Content is displayed in original English for accuracy.
Advertisement
Advertisement
⚡ Community Insights
Discussion Sentiment
71% Positive
Analyzed from 3655 words in the discussion.
Trending Topics
#office#cost#house#more#shed#install#building#home#where#mini

Discussion (100 Comments)Read Original on HackerNews
If you are lucky and fortunate enough to live in an actual house with land, and work (or are thinking about working) remotely, seriously consider investing in an actual separate building for your office.
In my opinion it's commuting to the office which sucks, and not working in the office: I had a couple years where I walked in to work every day, and that was basically ideal. (It was, ironically, a job I started while living on the opposite side of the country: I then moved to a place about a mile from the office, quite a pleasant walk through the heart of the city.)
We bought an old house and did a full remodel and planned for an office and a work kitchen (my wife is a chef) separated from the main house (and each other).
It's been a game changer
Why start and invest in a construction project for a building that may not be staffed long term? Perhaps renting a small coworking space in town is the safer financial move. And have your employer pay for it.
only as likely as literally every other scenario. the difference is you can continue to use your backyard office for your new job
> I had tried coworking spaces but didn’t love the vibe or the idea of spending hours in a phone booth.
> I got a ton of quotes for installing a mini split. They ranged from $4-$7k, which was higher than I expected after researching the cost of a quality small unit and knowing this would be a tiny job for an HVAC contractor, especially because I had my electrician prewire the electrical. I was considering installing a DIY system (Mr. Cool DIY system with pre-charged AC lines), But found an HVAC contractor who would install a system for a much lower price than the other quotes I received (and he had great reviews on Thumbtack). In the end, I got a Daikin Mini-split, a common system with many replacement parts. The installation took about 5 hours, and my tech did a great job. I am glad I researched and got a lot of quotes for this one.
It cost me ~650$ total.
The next time I bought a minisplit (3.5kW one), I already had the tools and it cost me only 450$. A proper one meant for use during harsh winter would probably costs a bit more though, at around 1000$.
So I have set up a few of them for my family and friends so far. The units come pre-charged with gas for ~5M of ducts, there is nothing hard to set them up.
I also set up ESP32 controllers so I could attach them to Home Assistant, bypassing any Chinese cloud apps, etc.
>160 hours of education/vocational training and 2 years’ verifiable experience in the trade
To get the license to install minisplits (two years experience generally means working an apprenticeship).
It's no wonder install costs are so much in the US. And as you've experienced, they're hardly rocket science to install. The 160 hours training would be more than enough, I'm not sure why 2 years experience gets tacked on the end.
It took me a while to find a company to install a mini split I purchased on my own, and I paid $$ for labor. This was only because I didn't have the time.
That said, mini splits are so cheap (sub $500) that its easier to just purchase a new one than repair.
It doesn’t take long to install a mini-split condenser with a single air handler. Precast pad for the condensing unit, set the condensing unit on the pad (or buy a wall mount if you need to mount it off the ground), run sealtite to the condenser from the disconnect switch and pull in wire, drill two holes for the line sets and one hole for the power/signal cable that runs from the condenser to the air handler, mount the air handler, connect the line sets, plug in the power/signal cable, install and wire the thermostat. Seal the holes with silicone and turn the mini-split on.
It’s less than a day of work, finding a mechanical contractor to install equipment you furnish for $160-175/hr shouldn’t be hard, contractors just like ripping off homeowners because they don’t know any better.
You don’t really even need a mechanical contractor with precharged line sets, just ensure the disconnect switch is off and locked out before touching any line voltage wiring, and make sure you mount anything heavy to studs and not plywood or drywall.
They're literally designed to be easy to install, but in the US licensing requirements tend to be insane (in my state it's 2 years apprenticeship experience for their 'easier to get' mini-split license) and HVAC companies make more off whole home systems.
These things are regularly installed DIY by homeowners (illegally most of the time but you know), it doesn't take two years of experience to be able to install these without issue. 2 weeks, or half a dozen installs surely would be more than enough.
I'm glad you measured CO2. I've recently noticed I tend to get headaches when working or sleeping in small poorly-ventilated spaces, and I'm surprised how often I encounter new structures without ventilation. I guess tightly-sealed buildings are still a relatively new idea.
In the PNW you could probably be comfortable >90% of days with a cracked window, fan, adjustable shades, and a little electric radiator, but if I was doing this project I'd probably opt for the modern heat pump / ERV combo as well.
But 8x10 for $20,000 just goes to show how expensive USA is for construction. There’s a point where I would review coworking space cost (not as convenient, I know) to just living and owning property abroad.
Electrical + AC is a firm line where that goes from shed to detached office.
Labor is expensive. You could probably close to double the size for an additional $10,000, you’d need another yard and a half of concrete for the foundation (6” depth*80 sqft = 40 cubic feet) and more material for the building, but not twice as much material, or labor. Electrical service could stay the same.l and the mini-split wouldn’t have to be much bigger.
What did it do to you that you needed to insult it?
I'm still planning on building out an office/studio, but it will be a much larger investment despite being able to DIY much of it.
Structurally a wet fart will hold up plenty of snow when we're talking spans on the order of 10ft. A garden shed that can literally roll away in a tornado is only a few hundred dollars of material different from one that can't.
Of course Tuff Shed (or anyone else) isn't gonna make a special product line for one town in CO or wherever that wants to de-facto outlaw the construction of shed by people less than a certain wealth level. Those people can have their stuff built from scratch at great cost. Of the dozen lost sales they were likely some of the most problematic anyway.
My feedback is merely: boy it'd be nice to have the option to just order a pre-built.
https://tuhat.net/@sbr/p/big-tech-sucks
The rack warms it in the winter so I don't need any extra cooling, and I run the AC in the summer.
but over the next few years i learned so many hobby art projects: insulation, electrical, sheetrock. a few inspections, a few consults. a few surprises that people in this state can just go buy the stuff at a box store!
and then eventually, my 12x6 foot office appeared, the same width as a 1960s metal tanker desk. finally!
and ... i instantly hated working out there. i didnt make it 6 weeks. it's just an office for storing crap, now: i work out of the house, where the kitchen, dogs, bathroom, are. but the journey was worth it, even if the destination was not.
https://www.youtube.com/watch?v=uFP-fU0FsF0
I don't recall how technical it is[^1] because I read it years ago, but Michael Pollan wrote an entire book about building himself a writing room:
https://michaelpollan.com/books/a-place-of-my-own/
[^1]: Being familiar with Pollan's writing, it's likely at least as much philosophical and meditative as technical and practical.
Monitors are relatively cheap these days, you can get a name brand 32" 4K monitor for around $300 - if someone busts in and steals it, the door/window repair will probably cost more than the monitor.
$20K still seems like a lot to get some mosquito bites walking through the yard to work. Lack of plumbing, coffee, etc (some of those are fixable of course) is a bit of a turnoff but perhaps the walk is part of the charm.
I find that with kids mostly in school and knowing the rules the exterior space isn’t a requirement, but I don’t have a ton of meetings these days so YMMV. Mostly this is cope because I don’t have 20K to drop on a cool office! :)
Nice work and thanks for the post!
In some parts of the world, people consider spending time outdoors to be a positive thing.
My mother-in-law lives in rural Missouri and had her 6x10 bathroom remodeled in 2025. Full gut replacement of everything. Total cost: $5600. I got a quote for something similar in a bit larger bathroom in our house in Seattle. Quoted price: $31,000.
Labor is a good chunk of cost, and the OP presented that he simply didn't have the time available to him to do that work himself. On the other hand, I built 20-ish feet of fencing for our backyard this summer, matching an existing design we had done several years ago. Quoted price from the same company that did it the first time: $9800. I did the work myself. My total cost: $1400.
That works out great, right? I also have a significant investment in all the right tools: compound mitre saw, construction-grade table saw, nail guns, impact/hammer/regular drills, angle grinders, power sanders, every drill bit in captivity -- I don't really lack for anything. These make a huge difference in the workmanship of the final outcome.
And that was just a fence. I've considered building an external office here at our house. When I start to take into account the scope of converting an outdoor shed to an acceptable backyard office, I hit the brakes. Electrical power under proper permits, adequate security, something that holds up under our weather, potential water/sewer access, and sufficient space to work (I can't live without a whiteboard)...there is more scope than meets the eye.
All things considered, I think the OP did a pretty good job here in terms of cost control and recognizing what he could do (windows) vs. needed someone else to do (proper electrical.)
Smaller jobs are more expensive per square foot because not all costs scale with size. Which is why you see all these godawful TJ Homes being built where they just rip out the house, build a 3 story structure (including basement) that takes every square inch of the lot.
You can yell at a contractor or the mirror but there's a tax.